Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Many MJOP activities are added automatically added when creating an element is created. In addition, these they can also be entered manually. When entering entered manually, a number of fields are mandatoryrequired. HUMBLE will make suggestions based on the data entered. These This data are is only an indication and may therefore be adjustedchanged. The price level year indicates the year from which year the cost suggestion of the costs comes. If it says 2017 Thus, if 2017 is entered here, five times there will be indexed five indexes with the set indexation percentagerate, if it is set.

▪ Preventive/periodic maintenance (PO). 
▪ Corrective maintenance (CO).
▪ Legal Maintenance maintenance (WO).
▪ Replacement Maintenance maintenance (VO).

HUMBLE contains a standard list of PO, WO and VO activities for elements (based on the NL-SfB coding). This list also includes contains cost lists figures for these activities.

PREVENTIVE/PERIODIC MAINTENANCE (PO)
Periodic (also called; preventive) maintenance on an element. This involves recurrent refers to recurring maintenance to ensure that the element does not need to be replaced earlier than the theoretical service lifebefore its theoretical lifetime. If the NL-SfB encoding coding is stored with an element, if known in the master data of HUMBLE, periodic maintenance activities are automatically created for the element if they are known in the master data of HUMBLE. These activities are also provided with costs. 

CORRECTIVE MAINTENANCE (CO)
Repairing The repair of defects; these are automatically created after adding the addition of a NEN 2767 defect. It can be either concern defects due to overdue maintenance, molestation , or other influences. In contrast to Corrective maintenance, unlike PO, WO and VO, corrective maintenance has no recurring character. These are It concerns one-off activities. 

LEGAL MAINTENANCE (WO)
Compliance activities or the legal obligations; these are automatically created by HUMBLE when adding an element or location (with location type Building). The automatic creation of compliance activities is done automatically based on the NL-SfB coding of the element. 

REPLACEMENT MAINTENANCE (VO).
Replacement of the element. The replacement Replacement activities, like the compliance and periodic maintenance activities, are created automatically created after adding an element. For this purpose, the year of construction and the theoretical lifespan in accordance with the life span according to NEN 2767 are used. The costs arise come from the cost number costing database managed by HUMBLE